1. Ready to begin strip.jpg
2. Top cover removed.jpg
3. Tail housing removed.jpg
4. Selector fork detail.jpg
5. 5th gear selector fork.jpg
6. Selector shaft removed.jpg
7. 3rd-4th gear selector fork removed.jpg
8. 1st-2nd gear selector fork removed.jpg
9. 5th gear selector fork removed.jpg
10. 5th gear synchro hub removal.jpg
11. 5th gear synchro hub detail.jpg
12. Mainshaft 5th gear removed.jpg
13. Intermediate housing and mainshaft removed.jpg
14. Modified puller to remove mainshaft.jpg
15. Modified puller detail.jpg
16. Gearbox parts laid out.jpg
17. Rear of maincase before grinding out.jpg
18. Rear of maincase after grinding out.jpg
19. Long first heavy duty laygear and shaft.jpg
20. Slotted gear to improve lubrication.jpg
21. Reverse idler reinstalled.jpg
22. Mainshaft reassembled..jpg
23. Shafts reassembled in maincase.jpg
24. Torqing up 5th gear cap nut.jpg
25. Selector shaft reassembled.jpg
26. Special tools.jpg
27. Layshaft bearing extractor and socket.jpg



go to top






Website design and SEO by Studio Montage

All content © 2001-16 LocostBuilders. Reproduction prohibited
Opinions expressed in public posts are those of the author and do not necessarily represent
the views of other users or any member of the LocostBuilders team.
Running XMB 1.8 Partagium [© 2002 XMB Group] on Apache under CentOS Linux
Founded, built and operated by ChrisW.