2engine in 3.jpg
gearbox bolted to chassis.jpg
engine nearly there.jpg
lowering engine in.jpg
block degreased.jpg
cam oil seal.jpg
silver block2.jpg
silver block.jpg
TDC cambelt tensioned and new thermostat.jpg
new oil seals and sump gasket.jpg
aux pulley.jpg
finished gearbox2.jpg
spaying gearbox.jpg
clean gearbox.jpg
chassis out ready for engine.jpg
new clutch.jpg
gearbox mounted on block.jpg
2engine in2.jpg
stripping in progress.jpg
timing marks on crank pulley.jpg
rocker cover fitted over new oil spray bar.jpg
finished gearbox.jpg
8flywheel.jpg



go to top






Website design and SEO by Studio Montage

All content © 2001-16 LocostBuilders. Reproduction prohibited
Opinions expressed in public posts are those of the author and do not necessarily represent
the views of other users or any member of the LocostBuilders team.
Running XMB 1.8 Partagium [© 2002 XMB Group] on Apache under CentOS Linux
Founded, built and operated by ChrisW.