20maart2005 (3).jpg
20maart20 bonnet (2).jpg
20maart20 bonnet (3).jpg
exhaust heat shield.jpg
22april2006 (1).jpg
22april2006 (3).jpg
noscone.jpg
splitting the viento nosecone.jpg
splitting the viento nosecone 1.jpg
12juli2005 front wing stay.jpg
alu bodywork.jpg
paper template.jpg
5april2005 (4).jpg
sawing slots.jpg
louvre tool.jpg
bonnet with slots.jpg
17april2006 (8).jpg
engine firewall.jpg
engine firewall 2.jpg
bottom louvre former.jpg
16mei2009 (4).JPG
16mei2009 (8)-border.jpg
finished bonnet with louvres.jpg
bonnet with louvres.jpg



go to top






Website design and SEO by Studio Montage

All content © 2001-16 LocostBuilders. Reproduction prohibited
Opinions expressed in public posts are those of the author and do not necessarily represent
the views of other users or any member of the LocostBuilders team.
Running XMB 1.8 Partagium [© 2002 XMB Group] on Apache under CentOS Linux
Founded, built and operated by ChrisW.