Connecting 100mm VDO Tac 2 v8 waisted spark

Connecting 100mm VDO Tacho to v8 waisted spark

ie this type



de wired the dizze so need to hook this up to range rover waised spark ( 4 coil units ) and switched from my ecu ( on the earth ).

Anyone know how to do this ( I have emailed etb as per there instructions ) just thought I would ask the collective .

Option 2 is to feed from my Vems ECU

Many thanks

Agriv8





Taller than your average Guy !
Management is like a tree of monkeys. - Those at the top look down and see a tree full of smiling faces. BUT Those at the bottom look up and see a tree full of a*seholes .............


View User's Profile View All Posts By User U2U Member
02GF74

posted on 14/4/09 at 08:19 AM Reply With Quote
if my sums are right, you connect any one coil and set rev counter to "2 cylinder" - just one snag as I reckon it only allows 4-6-8 selection.

so plan 2 is to connect a diode from any two coils to the rev counter and select "4 cylinder" or 4 diodes from all 4 coils and select "8 cylinder"

note: coils are wired as you have them and the diodes are in addtion as shown

as show below - the orientation of the diodes is critical!

plan 3 use vems - this may need a voltage converter from 0-5V to 0-12 V.


so you know I am not making this up;

[Edited on 14/4/09 by 02GF74] Rescued attachment rev.JPG
Rescued attachment rev.JPG







View User's Profile View All Posts By User U2U Member
Agriv8

posted on 16/4/09 at 08:42 AM Reply With Quote
Seems Vems is the easy option as the ecu and the tacho is only 3 inches apart I can use one of the p259 ports and get that to switch the 12 v signal with a 1 k resistor as shown here.



I will get down to maplin at dinner and give it a go.

thanks for your assistance

Agriv8





Taller than your average Guy !
Management is like a tree of monkeys. - Those at the top look down and see a tree full of smiling faces. BUT Those at the bottom look up and see a tree full of a*seholes .............


View User's Profile View All Posts By User U2U Member
02GF74

posted on 16/4/09 at 08:51 AM Reply With Quote
yep, tha'tll be simpler ... but you didn;t say plan2 was the main plan.






View User's Profile View All Posts By User U2U Member
Agriv8

posted on 16/4/09 at 08:21 PM Reply With Quote
Ahh thats what my project manager keeps teeling me.

Plan 1 is always the comfotable easy one.

Plan 2 usually means I have to go and do some work and learn somthing ( but usually ends up presenting itself as the best option as above )

Plan 3 is left for defalecting as much flack as possible somewhere else

Regards

Agriv8





Taller than your average Guy !
Management is like a tree of monkeys. - Those at the top look down and see a tree full of smiling faces. BUT Those at the bottom look up and see a tree full of a*seholes .............


View User's Profile View All Posts By User U2U Member

New Topic New Poll New Reply


go to top






Website design and SEO by Studio Montage

All content © 2001-16 LocostBuilders. Reproduction prohibited
Opinions expressed in public posts are those of the author and do not necessarily represent
the views of other users or any member of the LocostBuilders team.
Running XMB 1.8 Partagium [© 2002 XMB Group] on Apache under CentOS Linux
Founded, built and operated by ChrisW.