Printable Version | Subscribe | Add to Favourites
New Topic New Poll New Reply
Author: Subject: Fuel Rail - GSXR TB's
carl M

posted on 20/3/13 at 12:55 PM Reply With Quote
Fuel Rail - GSXR TB's

Hi,

Finally getting round to my finishing my Zetec FI conversion. (GSXR TB's + Megasquirt)

Has anyone got any god idea's for a fuel rail, I guess I have 2 options;

1. Use current set up but get new longer tubes made between plastic housings

2. Throw current set up away and use a new fuel rail.

Does anyone on this board make / sell anything suitable. (I'd rather that they go to Jenvey etc)

Thanks

Carl

p.s. not fixed on the above, any other genius idea's welcome

View User's Profile View All Posts By User U2U Member
r1_pete

posted on 20/3/13 at 01:07 PM Reply With Quote
Flak Monkey, David, was doing some at one bit, checkout his websete kitcar services, or try a u2u to him.

Fuel rail blank extrusions are getting easier to buy over here now, why not try making your own?

View User's Profile E-Mail User Visit User's Homepage View All Posts By User U2U Member
FASTdan

posted on 20/3/13 at 05:21 PM Reply With Quote
Hi,

If its the standard aluminium tube sections (10mm dia, 2 x O-rings) as found on early GSXR1000/1300 I make them for my own spacing kits. 12mm longer than standard for a Zetec. I can also extend the steel T-piece version.

Drop me a U2U.





NEW danST WEBSITE NOW LIVE! Bike carbs, throttle bodies and more......

http://www.danstengineering.co.uk/

NOTE:This user is registered as a LocostBuilders trader and may offer commercial services to other users
View User's Profile E-Mail User View All Posts By User U2U Member
will121

posted on 20/3/13 at 07:20 PM Reply With Quote
quote:
Originally posted by FASTdan
Hi,

If its the standard aluminium tube sections (10mm dia, 2 x O-rings) as found on early GSXR1000/1300 I make them for my own spacing kits. 12mm longer than standard for a Zetec. I can also extend the steel T-piece version.

Drop me a U2U.


thats basically what i done and easy way if you also looking to use the standard injectors

View User's Profile View All Posts By User U2U Member
Andybarbet

posted on 20/3/13 at 09:46 PM Reply With Quote
Here'show i did mine
centre fuel rail
centre fuel rail


Also a thread with a few more detailed pictures of what i have done:
http://www.locostbuilders.co.uk/viewthread.php?tid=175630

Still need to finish the connecting barb for the fuel pipe but havent had much time lately so it willhave to wait until work calms down a bit





Give a man a fish & it will feed him for a day, give him a fishing rod & you've saved a fish.

View User's Profile View All Posts By User U2U Member

New Topic New Poll New Reply


go to top






Website design and SEO by Studio Montage

All content © 2001-16 LocostBuilders. Reproduction prohibited
Opinions expressed in public posts are those of the author and do not necessarily represent
the views of other users or any member of the LocostBuilders team.
Running XMB 1.8 Partagium [© 2002 XMB Group] on Apache under CentOS Linux
Founded, built and operated by ChrisW.