Well, while I have not been able to buy much whilst getting my tax payed, I was tinkering around getting some fiddly jobs done.
First I made a plate, to sit in the lower nearside chassis, that would take my battery.
Battery Tray
This was then placed in position and bolted down then battery fitted and clamped down with 4 ali plates so that it cannot move in any direction. Then
I finished making my battery cable and clamped it securely down in place. The results are as below.
Battery in place
and
Battery from above
This gives me free space on the scuttle deck.
Free space
Oh and the other thing I have been Faffing around with is inlet ducting to the air flow meter.
Inlet ducting from above
and
Elephants trunk
Just need to finish :-
Connect up Cooling system.
Connect hydraulic clutch.
Nose cone & indicator mountings. (awaiting parts)
Exhaust manifold & Exhaust. (still to get)
Fit Bonnet & Bonnet locking systems.
Fit seats. (still to get)
Fit Fuel Tank. (still to get/make PLEASE, PLEASE, PLEASE, PLEASE, PLEASE, Trev, PLEASEEEEEEE)
Fit Rear Arches.
Fit Wheels & Tyres. (still to get)
Not much left now.
[Edited on 22/1/08 by jollygreengiant]
I would add a pair of boots for your feet to that list.